Year of Engagement: | 1982/83 |
Name of Project: | Irrigation System Management Project workshops & Spare Parts Identification. |
Any Other Pertinent information: |
Assisted 4 PIDs to make decisions replacements, consolidation, location Location and level of renovation of shops. Selected sites for new facilities, Provided scaled layouts plants for all Shops and specs of necessary components, estimated requirements The output to form the adequate input for the architect/ engineers final Design without additional guidance. Justified level of workshop improvements procedure including Consideration of Availability of other agency facilities Administrative organization and procedures Quantity of equipment to be maintained Surveyed equipment in the 4 PIDs Consolidated lists of spares required for different models of equipment And listed with cost prices the requirements for one years operation Considering existing stocks. |