Detailed Engineering for Acetone Flasher Packages:- 1- Detailed Engineering for Acetone Flasher in...
See moreEPC Green / Brown Field Development is to limit the impact on the environment by exporting gas to AD...
See moreProject Management Services for Vendor Packages Management including: Gas Dehydration Unit, Sand Ma...
See moreEngineering Services of Piping Stress Analysis for Water Disposal Lines....
See moreEngineering & Procurement Services for Complete EPC Technical Proposal Preparation....
See moreEngineering Services for Preparation of 03 building packages including 61 drawings in each package....
See moreEngineering & Procurement Services for Technical Proposals Preparation for Saudi Aramco....
See moreEngineering Services for Thermal & Mechanical Design Verification of E-1005 Amine Reboiler...
See moreExploration work was completed by Tethyan Copper Company which desires to produce 200,000 tons per y...
See moreJoint with IMC – Montan Consulting GmbH for development of Strategy & Plan for Thar Coal Open ...
See moreThe Study involved visits to USA and Brazil to study the technology and development of ethanol as fu...
See moreProject Advisory, development and Financial Consultancy Services for the $ 1.47 billion project. Pur...
See moreReview and Analysis of ICT and Customer Services, Management & Operations, Organization and Infr...
See moreAdvisory & Consultancy services for Pakistan Power Sector Debt Resolution Plan. This required ma...
See moreEMMAY in a joint venture with In-Consult (Pvt) Ltd is providing consultancy for setting up CTA at WA...
See moreLNG import project planning development and project management of feed, EPC package etc. Preparation...
See moreSub-Contract, Professional & Technical Services for Owner’s Engineer. EMR has highly qualified...
See moreThis is an agro-industry and it also involved a milk availability survey in the Gujrat/ Kharian area...
See moreA 38 page study has been carried out on the technical evaluations of the Commercially available anti...
See moreThis project forms part of Punjab Urban Development Programme Financed by the world blank. It includ...
See moreA comprehensive 50 page Tender Document has been prepared including Invitation to bid instructions t...
See moreFeasibility study for a grass root refinery including heavy oil upgrading was carried out for PARCO,...
See moreAfter receiving the comments on the economic evaluation of Multan Refinery Project by Foster Wheeler...
See moreA scheme has been drawn for implementation of extension of the Pipeline from Multan to Faisalabad/La...
See moreA further study was carried out on alternate modes of transportation i.e. Bowser, pipeline Rail and ...
See morePreparation of operational contract for a common carrier trunk System for petroleum product....
See moreIt involved preparation of a feasibility study for setting up of a grass root topping refinery at Hy...
See moreIt involved a complete feasibility study of a 2 million tons per year Oil refinery at multan involvi...
See moreAppraisal report for installing second hand imported machines for Producing Roll Steel and iron cast...
See moreA review was made to previous Market study for manufacturer of Bolts & Nuts including quality co...
See moreThis study was carried out regarding the requirements of the Metropolitan steel corporation for bala...
See moreReport on setting up of a bolt & nuts manufacture plant. Review of Market survey, local requirem...
See moreInvestment study for laying pipeline for transportation of crude oil from Dhurnal to Attock Refinery...
See moreDevelopment of the above gas field was undertaken by OGDC as a first priority inn their program of ...
See moreInformation Study was undertaken to ensure viability of dismantling and relocating a refinery at Mil...
See moreThe project required designing of the entire fire protection system for the new LPG plant being set...
See moreThe Study involved visits to USA and Brazil to study the technology and development of ethanol as fu...
See moreThe Chand Bagh School Campus (CBSC) has been set up by the Doon School Society of Pakistan at a dis...
See moreThe job included preparation of AC and DC schematic and wiring diagrams for a number of 220 KV panel...
See moreThe Chand Bagh School Campus (CBSC) has been set up by the DSSP at a distance approximately 9 Kilome...
See moreThe study covers import data, requirement of Structural & Rails, existing Mill manufacturing ec...
See moreThis was a World Bank funded Study on the distribution and use of Fertilizer in Pakistan. The Study...
See moreThe project involved investigating the possibility of relocating an ethylene plant in a developing c...
See moreThe survey covered 80 to 100 Melting Furnaces, Re-rolling Mills etc....
See moreThe study was required to assess the extent to which financing was justified in the private sector b...
See moreA Route Study was carried out for BCEOM on a grant from the Govt of France, recording routewise pas...
See moreStudy oriented towards advisability of investment and feasibility of indigenous manufacture....
See moreThis ADB financed investigation involved a manning levels and job evaluation study of Pak Arab and P...
See moreSaindak is the first non-ferrous mining/ extraction project in the country. Copper metal is the prin...
See moreUNIDO financed projects for 237 tanneries, Developed a master plan with routing to the landfill. Des...
See moreThis is a desk study based on secondary source data....
See moreThis survey concerns vocational training of women and is confined to the Punjab. Over 300 questionna...
See moreDetermine capacity for each trade/institute so as to replace supply driven programs with actual mark...
See moreThis is an ILO/UNDP aided survey. The sample includes 3000 passouts, 50 institute and 50 end users. ...
See moreAn intensive three weeks workshop to develop skills for design and delivery of experienced base trai...
See moreThis workshop was held in two parts, involving a practical consulting assignment carried out in Phas...
See moreA select group of organizations in the public, private and non-governmental organizations were invi...
See moreDeveloped a plan for academic/non/academic management and technical training for PIDs and WAPDA. Re...
See moreA Study of the Accounting systems of CDA was carried out. Recommendations on Improving the Accoun...
See moreThis involved a study of current systems and procedures to work out a computerization strategy for...
See moreThis World Bank financed project involved manual conversion from the existing Single Entry System to...
See moreEMMAY in a joint venture with In-Consult (Pvt) Ltd is providing consultancy for setting up CTA at WA...
See moreThe 15 month assignment was headquartered at sana’a Capital of Yemen Arab Republic The Programme ...
See moreThe already designed programme for the ToT training by GTZ was Modified for the Pakistani environmen...
See moreDifferent training programmes have been arranged both in-house and away for client organizations, th...
See moreTwo three day seminars were held in may and July 1997 in collaboration with PITAC/NPO &EPB. All ...
See moreEMMAY conducted these first ever seminar held in Pakistan. Dr Orion White a TQM specialist from USA ...
See moreAssisted 4 PIDs to make decisions replacements, consolidation, location Location and level of renova...
See moreExamined and evaluated existing facilities and procedures for equipment. Recommended S&D for s...
See moreDevelopment a plan for academic/non/academic management and technical training for Provincial Irriga...
See moreSoftware development is for books and periodicals. The assignment Include recommendations of suitabl...
See moreDeveloped a set of recommendation in meeting the requirements. Whether the Government is geared to m...
See moreThe study involved an evaluation of all factors leading up to a cash flow statement to ensure boa...
See moreProviding the system and procedures for shaheen Knitwear Ltd. This study indicates EMMAY’s through...
See moreThe study examined the following requirements KSEW Analysis of primary data with a view to the fi...
See moreAnalyzed existing problems , recommended shifting of Railway Board to Islamabad and appointment of o...
See moreWAPDA staff was involved in the HDSFC technique applied to Inventory control in which the following ...
See moreReviewing the organization of head Office of fauji Foundation the largest Industrial conglomerate in...
See moreTerm of References To study the scope of work of SEPCO and suggest its development phases, objectiv...
See moreEMMAY was assigned the task of evaluating the WB funded Program TA 1 involving 42 sub projects by fo...
See moreReviewing present structure of head office and what is relationship Should be with 25 subsidiaries ...
See moreEMMAY is worked as a sub contractor and consultant on an $30 Million consulting assignment . EMMAY p...
See moreWork Involved Includes Setting up of a pilot chrome recovery plant Selecting suitable site for sol...
See moreThis project concern a government statutory body involved in innovation of new Processes for electri...
See more